Late Draw
Late Draw
Late Draw
Late Draw
Late Draw
Late Draw

Late Draw

Brassicas, grains, peas & clover — the cold-hardy all-in-one built to outlast the season

Sale price$29.99
/
Size
Free shipping over $129. Earn a $25 credit at $200.
Free shipping $25 credit
No Till No Problem
No Till No Problem from $23.99
Kill Plot
Kill Plot from $32.99
Whitetail Hill Clover
Whitetail Hill Clover from $39.99
Late Season Brassicas
Late Season Brassicas from $29.99
Bucks and Beards
Bucks and Beards from $24.99
Soggy Bottoms
Soggy Bottoms from $29.99

✓ Usually ships in 1 business day  ·  ✓ 3rd-party tested  ·  ✓ Packed in the USA

Formerly known as Complete 2 - Late Draw is the same great blend with a new look!

One mix that covers all the bases - heavy on brassicas blended with other species like cereal grains, clovers, and Austrian winter peas this mix is designed to be cold hardy and last throughout the season in northern states or be a great late season plot in the south.

 

This mix blends together all the best cold hardy forages with multiple brassicas, winter peas, soybeans, and clover. This mix will really shine in the North where it will provide highly attractive forage from early season through late. It's hard to go wrong with this much variety. 

In the South this mix makes a great second half of your food plot plan providing a very cold hardy food source that will outlast even the coldest temps.

Excellent when used in conjunction with our Early Draw mix which is a less cold hardy blend that will shine early season in Northern states or all season in Southern states. This one-two-punch gives deer plenty of options to choose from and can be a killer combo for concentrating traffic on certain plots early vs late season. 

 

Ingredients:

Rutabaga

Triticale

New Zealand Forage Brassicas

Rape

Austrian Winter Peas

2 Clovers

 

How we formulated this mix:

Heavy on some of the most palatable and cold hardy brassicas like rutabagas, rape, and New Zealand forage brassicas. Triticale and Austrian winter peas provide an excellent nurse crop and early season attraction. Cold tolerant clover species provide excellent nutrition and help this mix stand up to graze pressure.

 

WHERE TO PLANT: Areas with full sun to partial shade. Can be grown in small plots, in logging roads, trails, etc. 

pH: 5.5-7.5

MINIMUM SOIL FERTILITY NEEDED: Moderate - Good

WHEN TO PLANT:

NORTH: Jul - Aug

CENTRAL: Aug - Sep

SOUTH: Aug - Sep

SOIL PREP: Disc, tiller, or plow, or can be used as a no-till planting just use landscape or hand rake or expose/lightly work soil. Culti-pack or drive over with an ATV before and after planting for best results. 

PLANTING DEPTH:  1/4in or less

FERTILIZER: For best results use the Whitetail Hill Soil Test and apply fertilizer as recommended by the test - Order at WhitetailHill.com

✓ Trusted by 40,000+ hunters
✓ Real people. Real help. Call or text: 256-415-4085
✓ Most orders ship within 1 business day
✓ 3rd-party tested for purity & germination

Built for the cold

When temps crash, this is still on the menu.

Late Draw (formerly Complete 2) is heavy on cold-hardy brassicas, blended with cereal grains, Austrian winter peas, and clover. It shines up North — highly attractive from early season clear through the coldest late-season days — and makes a killer mid-late season plot in the South.

Pair it with Early Draw for a one-two punch that gives deer options and lets you concentrate traffic on the right plot at the right time.

Built to perform

Cold-hardy and graze-tough

✓ Outlasts the cold
Multiple cold-hardy brassicas keep producing attractive forage long after other plots quit.
✓ Early nurse crop, late payoff
Triticale and winter peas give fast early attraction while the brassicas build for late season.
✓ Half of a killer combo
Run it with Early Draw to split early- and late-season traffic across different plots.

Dead simple to plant

Three steps to a late-season draw

1
Prep the seedbed
Disc, till, or plow — or go no-till and just rake/lightly expose the soil. Then smooth and firm it down.
2
Sow the seed
Small seed — don't bury it. Spread it right on the firmed, smoothed soil; ¼" is perfect.
3
Press it in
Cultipack or drive over the plot to press the seed into the soil for good seed-to-soil contact. That's all it needs.
✓

Independently tested — no mystery seed

Every batch is third-party tested for purity and germination before it’s ever shipped out. We process, package, and ship every order right here in Cherokee, Alabama, so you know exactly what you’re putting in the ground — no filler, no guesswork. Questions? Real people who hunt and plant answer the phone.

256-415-4085
Call or text us, Mon-Fri 9-5

What’s in the bag

A cold-hardy composite blend

Heavy on the most palatable, cold-hardy brassicas — rutabaga, rape, and New Zealand forage brassicas. Triticale and Austrian winter peas add a nurse crop and early attraction; cold-tolerant clovers add nutrition and graze tolerance.
RutabagaTriticaleNew Zealand Forage BrassicasRapeAustrian Winter Peas2 Clovers

The growing details

Plant with confidence

Where to plantFull sun to partial shade. Small plots, logging roads, trails.
Ideal pH5.5 – 7.5
Soil fertilityModerate – Good
Planting depth¼" or less
Plot sizeSmall plots to fields

When to plant

North
Jul–Aug
Central
Aug–Sep
South
Aug–Sep
Plant it right — start with a Soil Test Kit
The only way to know what your dirt actually needs. Just $17.
Add Soil Test →

Before you buy

Questions, answered

How much does it cover?
The grip jug (6.0 lb) covers 1/2 acre. The 24 lb bucket covers up to 2 acres.
Late Draw or Early Draw?
Up North, Late Draw is your cold-hardy late-season plot; in the South it's a great late-season option. Plant Early Draw alongside it to cover the early season too.
Is the seed tested?
Yes. Every batch is third-party tested for purity and germination before it’s ever shipped out, so you know exactly what you’re planting — no filler.
How fast do I get it?
Most orders ship within 1 business day (all within 3 at the latest). From there it travels UPS Ground — typically 2–4 business days in the lower 48, so most orders arrive in about a week. You’ll get tracking by email the moment it leaves our dock.
Not sure this is the right blend?
Use our free Seed Selection Guide and we’ll match you to the perfect seed in under a minute.
Keep them fed when it counts most.
Most orders ship within 1 business day · third-party tested for germination.

Customer Reviews

Overall rating: 4.9 / 5 from 35 reviews.

Customer photo review of Complete 2

I got a rain the day after I finished planting. The plots were coming up 2 days later.

Complete 2

Customer photo review of Late Draw

Brassica mix growing well along field edge 3 acres. Deer in it every day

Late Draw

Customer photo review of Late Draw

The seed germinated and came up with a minimum amount of rain and has been quite healthy since. The deer and turkey seem to enjoy it.

Late Draw

Customer photo review of Late Draw

Great product! This is a mix of late draw and soggy bottoms.

Late Draw

Customer photo review of Late Draw

It did come in quick we are using it in place of garden for winter to and to also condition the soil.

Late Draw

Customer photo review of Late Draw

Field is looking good and the deer are attracted to it

Late Draw

Customer photo review of Late Draw

Planted yesterday; hasn't rained much this year. Today we have received almost 2 inches. I think it will definitely help germination.

Late Draw

Customer photo review of Late Draw

Great product came up fast and thick

Late Draw

Customer photo review of Late Draw

Deer are loving this one already

Late Draw

Customer photo review of Late Draw

This is the best Seed I’ve ever used

Late Draw

Customer photo review of Late Draw

Came up after 4 days. This is 3 weeks after planting.

Late Draw

Customer photo review of Late Draw

Love the product!

Late Draw

Customer photo review of Late Draw

Planted on Sunday growth on Wednesday!

Late Draw

Quick delivery,good service , I have a question , I purchased late draw from the wrong company, vegetableseedflowers , I received the wrong sized order , I ordered the 24lbs and received the 6lbs and they have been the worst customer service I’ve ever experienced, it looks like it came from warehouse??? Please help

Late Draw

Everything I’ve ordered from yall does great. My recent orders are struggling but doing surprisingly well considering we have only had two rains since I planted.

Late Draw

everything was good

Late Draw

Love it. Dont have pictures but it was coming up n just about 7 days

Late Draw

Plots turned out great, but my order took a bit longer than it should have to arrive, and I had to reach out about the progress before it shipped.

Late Draw

Great product. Fast shipping.

Late Draw

Very good germination, deer definitely hitting it hard already

Late Draw

Planted in mid September, it came up fast, then we had several days of very heavy rain, and it started turning yellow, now that it's drying out a little it seems to be coming back some, the only reason for not giving 5 stars at this time, I need more time to see how it does, but so far I'm happy with it

Late Draw

Quick arrival, planted and starting seeing results in less than a week, deer are already hitting in the plot

Late Draw

Great people Great products

Late Draw

Good quality seed.

Late Draw

Just Planted this year for the first time. I'll report back later.

Late Draw

no

Late Draw

Great product!! planted this product in the middle of a severe drought, with two weeks of no rain after planting I was really concerned that I was going to have poor results, but this product surprised me and is looking great after 6 weeks of planting it, I have a nice, lush plot growing!!!

Late Draw

It popped up quickly but hit a drought for a few weeks. Now it seems really sparsely growing. Keeping my fingers crossed it gets better.

Late Draw

Everything whitetail hill sells is top notch.

Late Draw

Planted it in August around my pumpkins and sunflowers, can hardly see the pumpkins now. Sure makes my food plot look wonderful. Will take down the electric fence in October then we’ll see how good it is.

Late Draw

Fantastic

Late Draw

Deer loved it

Complete 2

Sprouted quickly just waiting for deer season

Complete 2

Good stuff my plots came right up

Complete 2

Came with a great planting guide. Quick shipping, easy to use the website and find the right seeds to buy.

Complete 2

You may also like

START WITH THE RIGHT SEED

Get matched with the best seed for your plots instantly. Our interactive seed selection guide helps you choose the right seed for the job. No more guessing.

USE SEED SELECTION GUIDE NOW

Recently viewed